Cases
Proven on Real Surfaces, in Real Waters
Representative project summaries below. Detailed case data and customer references available on request.

Shipping
Bulk Carrier Hull Cleaning at Anchorage
- Challenge
- Heavy microbial fouling on a bulk carrier hull increased fuel consumption; dry-docking was not scheduled for months. (placeholder)
- Solution
- Dual-Disk Cleaning Robot deployed from a service vessel with IP65 ground station and marine piston pump. (placeholder)
- Result
- Full hull cleaned within the anchorage window without divers in the water. (placeholder)

Aquaculture
Deep-Sea Net Cage Cleaning for Marine Ranch
- Challenge
- Fouled net cages reduced water exchange across a deep-sea marine ranch site. (placeholder)
- Solution
- Single-Disk Cleaning Robot with 60 m buoyant cable operating along cage walls. (placeholder)
- Result
- Water flow restored across cleaned cages with no net damage reported. (placeholder)

Offshore Energy
Offshore Wind Turbine Pile Cleaning Pilot
- Challenge
- Splash-zone fouling on turbine piles required inspection and cleaning in short weather windows. (placeholder)
- Solution
- Dual-Disk Cleaning Robot with deck-side monitoring from the support vessel. (placeholder)
- Result
- Pile surfaces cleaned and inspected within a single operation window. (placeholder)

High-Rise Facade
High-Rise Glass Curtain-Wall Cleaning
- Challenge
- A super-high-rise glass curtain wall needed periodic cleaning; rope-access work was weather-limited and carried high-altitude safety risks. (placeholder)
- Solution
- UAV Curtain-Wall Cleaning System with high-precision positioning, obstacle avoidance and tethered power & water supply. (placeholder)
- Result
- Facade cleaned in standardized passes with no personnel suspended at height. (placeholder)
Case summaries above are representative placeholders — official case data will be published once approved by customers.
